1A-18 HEATER AND VENTILATION
11) Remove heater core pipe clamps (1) and grommet (2).
12) Pull out heater core (1) from unit (2).
INSTALLATION
1) Install heater unit by reversing removal procedure, noting the
following items.
D When installing each part, be careful not to catch any cable or
wiring harness.
D When installing steering column assembly, refer to STEER-
ING COLUMN INSTALLATION in Section 3C or 3C1.
2) Install control cables. (Refer to HEATER CONTROL CABLES in
this section.)
3) Fill engine coolant to radiator.
4) Enable air bag system, if equipped. Refer to ENABLING AIR
BAG SYSTEM in Section 10B.
5) Evacuate and charge system. Refer to items EVACUATING
SYSTEM and PROCEDURE OF CHARGING in Section 1B.