1. GETTING STARTED
1.4 Workflow
The following is the workflow of actions required before the equipment power is turned on.
Unpack this equipment
Install extension boards
Install this equipment
Connect hardware
Turn on the power
For details about installing an extension board, see
6.3.4 Installing and removing an extension board.
See 1.6 Installation Environment.
See 1.7 Hardware Connections.
See 2.1 Before Turning On the Power.
1-2