Huawei AP8082DN Hardware Installation And Maintenance Manual page 103

Table of Contents

Advertisement

AP8082DN and AP8182DN
Hardware Installation and Maintenance Guide
Figure 6-85
Figure 6-85 Pins of an RJ45 connector
Pin8
Procedure
Step 1 Feed both connectors of the cable into the ports of the cable tester.
Step 2 After the connectors are properly inserted, turn on the tester. If the indicators from 1 to G turn
on simultaneously, you can infer that the pins work normally and the wires are correctly
connected.
Figure 6-86 Testing the conduction and connections of wires
Step 3 Gently shake the connector and repeat
good contact with the core wires and Ethernet ports, as shown in
Issue 03 (2019-04-01)
RJ45 Connector 1
7
shows the pins of an RJ45 connector.
Pin1
NOTE
Turn the switch to the S position to slow down lighting of the indicators so that you can see the
indicators more clearly, as shown in
Copyright © Huawei Technologies Co., Ltd.
RJ45 Connector 2
Core Wire Color
7
Brown-White
Figure
6-86.
Step 2
to check whether the metal contact strips are in
6 Appendix
Twisted or Not
Figure
6-87.
96

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ap8182dn02351kqb02351kqc

Table of Contents