Huawei AP8082DN Hardware Installation And Maintenance Manual page 5

Table of Contents

Advertisement

AP8082DN and AP8182DN
Hardware Installation and Maintenance Guide
Contents
6.1.1 Cable Assembly Precautions..................................................................................................................................... 50
6.1.2 Assembling Power Cables......................................................................................................................................... 51
6.1.2.1 Assembling a DC 2-Pin Round Connector (A)...................................................................................................... 51
6.1.2.2 Assembling a DC 2-Pin Round Connector (B)...................................................................................................... 56
6.1.2.3 Assembling the OT Terminal and Power Cable..................................................................................................... 62
6.1.2.4 Assembling the JG Terminal and Power Cable...................................................................................................... 65
6.1.2.5 Assembling the Cord End Terminal and the Power Cable..................................................................................... 68
6.1.3 Assembling Ethernet Cables......................................................................................................................................71
6.1.3.1 Assembling the Shielded RJ45 Connector and Ethernet Cable..............................................................................71
6.1.3.4 Assembling a Shielded RJ45 Connector and an FTP Network Cable....................................................................85
6.1.3.5 Assembling an Unshielded RJ45 Connector and Ethernet Cable...........................................................................90
6.1.3.6 Checking the Appearance of Contact Strips...........................................................................................................92
6.1.3.7 Testing the Connection of Assembled Cables........................................................................................................ 95
6.1.3.8 Common Network Cable Faults and Preventive Measures.................................................................................... 98
6.1.4 Assembling Feeders...................................................................................................................................................99
6.1.4.1 Assembling the Straight Male Coaxial N Connector and the 1/2'' Feeder............................................................. 99
6.1.4.2 Assembling a Straight Male Coaxial N Connector and an RG8U Feeder............................................................103
6.1.5 Installing Cable Accessories....................................................................................................................................109
6.1.5.1 Precautions for Installing Cable Accessories....................................................................................................... 109
6.1.5.2 Installing Power Adapters.....................................................................................................................................110
6.1.5.2.1 Installing the OT Terminal.................................................................................................................................110
6.1.5.2.2 Installing the Cord End Terminal.......................................................................................................................113
6.1.5.2.3 Installing a 2-Pin Round Connector and a DC Power Cable.............................................................................114
6.1.5.3 Installing Ethernet Adapters................................................................................................................................. 117
6.1.5.3.1 Installing a Shielded Ethernet Connector.......................................................................................................... 117
6.1.5.3.2 Installing an Unshielded Ethernet Connector.................................................................................................... 118
6.1.5.4 Installing Fiber Connectors.................................................................................................................................. 120
6.1.5.4.1 Cleaning Fiber Connectors................................................................................................................................ 120
6.1.5.4.2 Installing an FC Fiber Connector...................................................................................................................... 120
6.1.5.4.3 Installing an LC Fiber Connector...................................................................................................................... 122
6.1.5.4.4 Installing the SC Fiber Connector..................................................................................................................... 124
6.1.5.4.5 Installing an MPO Connector............................................................................................................................ 125
6.1.6 Replacing the Mold of the Crimping Tool...............................................................................................................127
6.2 Environmental Requirements for Device Operation.................................................................................................. 130
6.2.1 Environmental Requirements for an Equipment Room.......................................................................................... 130
6.2.1.1 Requirements for Selecting a Site for an Equipment Room.................................................................................130
6.2.1.2 Equipment Room Layout......................................................................................................................................131
6.2.1.3 Construction Requirements for the Equipment Room......................................................................................... 132
6.2.1.4 Equipment Room Environment............................................................................................................................ 133
6.2.1.5 Requirements for Corrosive Gases....................................................................................................................... 134
Issue 03 (2019-04-01)
Copyright © Huawei Technologies Co., Ltd.
iv

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ap8182dn02351kqb02351kqc

Table of Contents