2.9 Powering on the AP

After the AP is powered on, observe indicators on the AP to determine the system running
status. For details, see
Issue 03 (2019-04-01)
Check Item
The power cables and ground cables are separated from other cables and
bundled separately.
The working ground, protection ground, and surge protection ground
share the same group of ground bars.
Connectors of signal cables are complete, intact, and tightly connected.
The signal cables are not damaged or broken.
PG connectors of network cables and optical fibers are secured fastened
as required.
Labels on cables, feeders, or jumpers are clear and correct.
1.2 Indicator
NOTE
Do not frequently power on and off the device.
Copyright © Huawei Technologies Co., Ltd.
Description.
2 AP Installation
42

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ap8182dn02351kqb02351kqc

Table of Contents