Huawei AP8082DN Hardware Installation And Maintenance Manual page 74

Table of Contents

Advertisement

AP8082DN and AP8182DN
Hardware Installation and Maintenance Guide
Table 6-3 Mapping between the cross-sectional area of the conductor and the value of L
Cross-Sectional Area of Conductor
(mm
16 (0.025)
25 (0.039)
35 (0.054)
50 (0.077)
Step 2 Put the heat shrink tubing onto the bare crimping terminal, as shown in
Figure 6-29 Putting the heat shrink tubing onto the bare crimping terminal
Step 3 Put the bare crimping terminal onto the exposed conductor, and ensure that the bare crimping
terminal is in good contact with the insulation of the power cable, as shown in
Step 4 Crimp the joint parts of the bare crimping terminal and the conductor, as shown in
6-30.
Figure 6-30 Crimping the joint parts of the bare crimping terminal and the conductor (JG
terminal)
Issue 03 (2019-04-01)
2
2
(in.
))
Copyright © Huawei Technologies Co., Ltd.
Value of L (mm(in.))
13 (0.51)
14 (0.55)
16 (0.63)
16 (0.63)
6 Appendix
Figure
6-29.
Figure
6-29.
Figure
67