Huawei AP8082DN Hardware Installation And Maintenance Manual page 94

Table of Contents

Advertisement

AP8082DN and AP8182DN
Hardware Installation and Maintenance Guide
Figure 6-68 Cutting off the PET membrane and ground cables
Step 4 Arrange the twisted core wires according to color order shown in
pliers to neatly cut the front end of the twisted pair, as shown in
shows pin arrangement of each contact of the connector.
Figure 6-69 Mapping between colors and pins
Issue 03 (2019-04-01)
Copyright © Huawei Technologies Co., Ltd.
6 Appendix
Figure
6-69. Use cutting
Figure
6-70.
Figure 6-71
87

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ap8182dn02351kqb02351kqc

Table of Contents