Figure 6-27
Figure 6-27 Components of a JG terminal and a power cable
A. JG terminal B. Heat-shrinkable tubing C. Insulation layer of a power
Procedure
Step 1 Strip a part of the insulation to expose the cable conductor with a length of L, as shown in
Figure
l When you strip a power cable, do not damage the conductor of the cable.
l If the bare crimping terminal is not provided by Huawei, you can adjust the value of L as
Figure 6-28 Stripping a power cable (JG terminal)
Issue 03 (2019-04-01)
shows the components of a JG terminal and a power cable.
6-28. The recommended values of L are listed in
required.
Copyright © Huawei Technologies Co., Ltd.
cable
Table
6 Appendix
D. Conductor of a power cable
6-3.
66

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ap8182dn02351kqb02351kqc

Table of Contents