Fig. 6-4 Preparing Power Cables For Sealing Modules - ABB ACS5000 User Manual

Medium voltage ac drive air-cooled, 2 - 7 mva
Hide thumbs Also See for ACS5000:
Table of Contents

Advertisement

Chapter 6 - Electrical installation
Preparing cables for cable entries with sealing modules
1
2
3
4
6
7
10
11
1
Outer cable sheath
2
Sealing module
3
Frame
4
Conductive foil of sealing module
5
Cable sheath removed to expose cable shield
6
Cable clamp
7
Shrinkable sheath seal
8
Shield extension to be connected to PG busbar
9
Cable screen extension to be connected to the PG busbar
10
Heat-shrinkable termination
11
Cable lug as specified by the cable supplier and suitable for M12 bolt
12
Sheath seal
Fig. 6-4
Preparing power cables for sealing modules
6-8 (22)
Prepare cables with an outer cable screen or shield for EMC bonding
with the metal enclosure of the cabinet as illustrated in
Install the sealing modules according to the instructions of the sealing
module supplier.
3BHS221906 ZAB E01 Rev. D
5
12
8
9
ABB
Fig.
6-5.
5k A UM

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents