Required qualification

7.2

Commissioning procedure

7.3

Commissioning check list

7.4

Customer assistance

7.5

Customer acceptance

5k A UM
Commissioning, parameter settings and functional tests of the drive must
be carried out only by commissioning personnel certified by ABB.
Information on the commissioning procedure and the start conditions for
commissioning can be obtained from ABB.
To contact the ABB service organization, see
In order to ensure uncomplicated and speedy commissioning, it is
important that drive and associated equipment are ready for
commissioning. Reviewing and completing the items in the
Commissioning check list
site will help to achieve this.
During the commissioning period, the customer is requested to provide
qualified personnel for assistance, who are
experienced with medium and low voltage equipment and with the
local safety regulations,
familiar with the driven process,
authorized to operate associated medium and low voltage equipment
(eg, main circuit breaker, other low and medium voltage switchgear),
authorized to operate the driven process for functional tests.
When commissioning has been completed, the commissioning report is
signed by the responsible commissioning personnel and by the customer
as a sign of acceptance. A copy of the report and a copy of the actual
parameter settings are handed out to the customer.
3BHS221906 ZAB E01 Rev. D
Contact
before the commissioning personnel arrive on
information.