Installation Verification - Huawei NetCol8000-C070 User Manual

Hide thumbs Also See for NetCol8000-C070:
Table of Contents

Advertisement

NetCol8000-C(070, 130, 190) In-room Chilled Water
Smart Cooling Product
User Manual
Figure 3-66 Installing the front panel
----End

3.7 Installation Verification

After installing a unit, check the components listed in
Table 3-9 Component checklist
Check Item
Cabinet
(Optional)
Electric heater
Water pan
(Optional)
Wet film
humidifier
Issue 09 (2022-12-15)
Expected Result
The cabinet is installed properly, without
any tilt.
The cabinet is secured to the support by
using bolts.
The foreign matter inside the cabinet,
such as cable ties and stubs, has been
cleaned up.
The electric heater is secured.
The foreign matter inside the water pan is
cleaned up.
The water inlet solenoid valve is secured.
The wet film humidifier is secured reliably
and steadily.
Pipes are connected securely without
leakage.
Copyright © Huawei Digital Power Technologies Co., Ltd.
3 Installation
Table
3-9.
Actual Result
□Passed □Failed
□Passed □Failed
□Passed □Failed
□Passed □Failed
□Passed □Failed
□Passed □Failed
□Passed □Failed
□Passed □Failed
94

Advertisement

Table of Contents
loading

This manual is also suitable for:

Netcol8000-c130Netcol8000-c190

Table of Contents