Step 6 View the commissioning result.
Issue 09 (2022-12-15)
NO TE
The fan commissioning item is mandatory. After commissioning for a component succeeds,
the system automatically performs commissioning for the next component you selected. If
commissioning fails, wizard-based startup ends.
The screen shown in
succeeds.
Figure 4-20 Commissioning successfully
The screen shown in
fails, which ends commissioning in the wizard-based startup.
Figure 4-21 Commissioning failed
NO TE
If commissioning fails, tap Commissioning failed. in
as shown in
Figure
Copyright © Huawei Digital Power Technologies Co., Ltd.
Figure 4-20
is displayed if component commissioning
Figure 4-21
is displayed if component commissioning
4-22.
4 Power-On Commissioning
Figure 4-21
to view the details,