Pipe Ports
The following table lists the pipe ports reserved on the NetCol8000-C.
Table 3-1 Pipe ports
Item
Water outlet pipe
Water inlet pipe
Humidifier water inlet pipe
Drainpipe
System Requirements
Table 3-2 System requirements
Item
Door
Floor
Pipe routing
Maintenance distance
Power distribution
requirements

3.2 Installation Preparations

3.2.1 Tools

The onsite technical personnel can select tools based on the site requirements.
Issue 09 (2022-12-15)
Copyright © Huawei Digital Power Technologies Co., Ltd.
Specifications
G 2 inch port with internal threads
G 2 inch port with internal threads
G 3/4 inch port with external threads
G 3/4 inch port with internal threads
Specifications
Width ≥ 1.7 m; height ≥ 2.3 m; turning radius ≥
3.2 m
Floor bearing capacity ≥ 400 kg/m
Upflow: left pipe routing, left and bottom pipe
routing
Downflow: left and bottom pipe routing
Front maintenance distance ≥ 900 mm
Leakage circuit breakers are not recommended
for the main power route. If leakage circuit
breakers are required by the customer or by
local regulations, use the residual current
circuit breaker (RCCB) that is not sensitive to
the single-phase DC pulses and transient
current pulses.
3 Installation
2
40

Advertisement

Table of Contents
loading

This manual is also suitable for:

Netcol8000-c130Netcol8000-c190

Table of Contents