Huawei NetCol8000-C070 User Manual page 143

Hide thumbs Also See for NetCol8000-C070:
Table of Contents

Advertisement

NetCol8000-C(070, 130, 190) In-room Chilled Water
Smart Cooling Product
User Manual
Table 4-10 Commissioning checklist
Check Item
No oil stain exists on the copper pipe thermal insulation
foam or bottom plate, or it has been cleaned.
The needle valve plug is secured (torque of 0.45±0.05
N·m), and the valve bonnet is tightened.
The foreign matter inside the water pan and bottom plate
is cleaned up.
The air filter is correctly installed according to the air flow
direction on the frame.
Check that the chilled water valve is closed.
Issue 09 (2022-12-15)
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Power-On Commissioning
Actual Result
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
133

Advertisement

Table of Contents
loading

This manual is also suitable for:

Netcol8000-c130Netcol8000-c190

Table of Contents