Chapter 2 Hardware
>
2.2 Standard Operations
2.1.3.2
AC outlet box (2U)
Figure 2.18 AC outlet box (2U)
2.2
Standard Operations
This section explains how to turn the device on and off, and how to attach and remove the front
cover.
2.2.1
Power ON Control
This section describes the procedure to turn the power on.
IMPORTANT
P3AM-3042-03ENZ0
ETERNUS DX60/DX80 Disk storage system User Guide
Main line switch
Outlet (OUTPUT)
Power cords (AC output cable)
are connected here.
•
After turning the power on, it takes about 3 minutes for the device to
become READY (i.e. the READY LED turns on). If an error is detected
during the initial power-on diagnostic phase, a longer time (up to ten
minutes) may be required before the READY LED turns on.
•
Before turning the server on, check that the device, Fibre Channel
switch, and Fibre Channel hub are all READY. If the server is turned on
while any of these devices are not READY, the server may not be able to
recognize the device.
•
When the device power is turned on at the first time, a factory preset
volume formatting process may occur.
55
Inlet
Power cords (AC Input cable
are connected here.
Copyright 2009 FUJITSU LIMITED