Start-Up; Chapter Overview; How To Start-Up - ABB ACS800 Series Firmware Manual

Center winder/unwind control program
Hide thumbs Also See for ACS800 Series:
Table of Contents

Advertisement

Start-up

Chapter overview

The chapter instructs how to:
• complete the initial start-up.
• perform an identification run (ID Run) for the drive.

How to start-up

The start-up may only be carried out by a qualified electrician.
The safety instructions must be followed during the start-up procedure. See the
appropriate hardware manual for safety instructions.
Check the installation. See the installation checklist in the appropriate hardware/installation
manual.
Check that the starting of the motor does not cause any danger.
De-couple the driven machine if:
- There is a risk of damage in case of incorrect direction of rotation, or
- A Standard ID Run needs to be performed during the drive setup (see subsection
perform the ID Run
Apply mains power. The control panel first shows the panel
identification data ...
...then the Identification Display of the drive ...
...and after a few seconds the panel enters the Actual Signal
Display.
The drive is now ready for the start-up.
SAFETY
on page 7).
POWER-UP
How to
CDP312 PANEL
Vx.xx
.......
ACS 800
xx kW
ID NUMBER 1
1
->
0.0 rpm O
FREQ
0.00 Hz
CURRENT
0.00 A
POWER
0.00 %
Start-up
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs800-u2Acs800-u7Acs800-u4

Table of Contents