Step 7 Install a new strip light.
Step 8 Install the new strip light by performing the preceding steps in reverse order.
Step 9 On the ECC800-Pro WebUI, choose Maintenance > Opening Guide > Linkage
Test > eLight actuators Commissioning and click Test. The eLight strip light is lit
up in red, green, blue, and white in sequence for 3 seconds respectively, and then
turns off.
----End

5.4.24 Replacing an eLight Actuator

Impact on the System
The eLight strip light is off during replacement.
Preparations
Issue 01 (2020-12-25)
Tools: ESD gloves, Phillips screwdriver, step ladder, label, marker
Material: eLight actuator
Figure 5-84 Positions of the eLight actuator and power supply (inside the
aisle)
(1) eLight actuator
(3) Upstream fuse
Copyright © Huawei Technologies Co., Ltd.
5 Parts Replacement
(2) eLight power supply
128