FusionModule2000 Smart Modular Data Center
Maintenance Guide (Fusion Module Actuator)
Item
Fire control
linkage function
Connection of
iBAT (BIM)
Issue 01 (2020-12-25)
Method
Generate
smoke
under a
smoke
detector or
multi-
functional
sensor. (If
real smoke
is not
allowed,
press the
TEST button
on the
sensor.)
Check
whether the
iBAT (BIM)
is attached
firmly and
whether all
cables are
securely
connected.
Copyright © Huawei Technologies Co., Ltd.
Expected Result
● A smoke alarm
is displayed on
the active
alarm page of
the WebUI.
● The skylight is
opened.
● The alarm
beacon
produces
audible and
visual alarms.
● The iBAT (BIM)
is attached
firmly.
● All iBAT (BIM)
cables are
securely
connected.
● No iBAT (BIM)
cable
deteriorates
and the
insulation layer
does not crack.
3 Routine Maintenance
Troubleshooting
● Check whether the
smoke detector or
multi-functional
sensor is faulty.
● Check whether the
skylight system is
normal.
● If the alarm beacon
produces audible
and visual alarms,
check whether the
alarm beacon is
faulty and whether
the cable
connection is
proper.
● Secure the iBAT
(BIM) again.
● Check that all iBAT
(BIM) cables are
securely connected.
● Replace the faulty
cable.
31