ABB ACS5000 User Manual page 5

Water-cooled (generation 2)
Hide thumbs Also See for ACS5000:
Table of Contents

Advertisement

5.4.5.
Installation material.............................................................................................................67
5.4.6.
Tools ........................................................................................................................................67
5.5.
Preparing the installation site...................................................................................................... 68
5.6.
Aligning transport units ................................................................................................................ 69
5.7.
Joining transport units ................................................................................................................... 71
5.8.
Applying silicone...............................................................................................................................72
5.9.
Installing roof joints.........................................................................................................................72
5.10. Installing roof-mounted cooling units ........................................................................................73
5.10.1.
Lifting a cooling unit with a crane ...................................................................................73
5.10.2.
Installing IP42 roof-mounted cooling units...................................................................74
5.10.3.
Installing IP54 roof-mounted cooling units...................................................................76
5.11.
Installing roof attachments on marine drives...........................................................................78
5.12. Joining water pipes......................................................................................................................... 80
5.12.1.
Removing a pipe joint ........................................................................................................ 80
5.13. Joining busbars ................................................................................................................................81
5.13.1.
AC busbars............................................................................................................................ 82
5.13.2.
PE ground busbar ............................................................................................................... 82
5.13.3.
DC busbars ........................................................................................................................... 83
5.14. Connecting the heating cable ...................................................................................................... 83
5.15. Connecting raw water pipes......................................................................................................... 84
5.16. Fixing the drive to the floor .......................................................................................................... 84
6. Electrical installation ...........................................................................................................85
6.1.
Safety.................................................................................................................................................. 85
6.2.
Overview ............................................................................................................................................ 85
6.3.
Cable requirements ........................................................................................................................ 85
6.3.1.
Power cables......................................................................................................................... 85
6.3.2.
Auxiliary and control cables.............................................................................................. 85
6.4.
Grounding ......................................................................................................................................... 86
6.4.1.
Grounding the transformer and an 18-pulse drive ..................................................... 86
6.4.2.
Grounding the transformer and a 36-pulse drive ........................................................87
6.4.3.
Grounding the drive and the motor (multi-point bonding) ..................................... 88
6.4.4.
Grounding the drive and the motor (single-point bonding).................................... 89
6.4.5.
Ground cable connection .................................................................................................. 90
6.4.6.
EXU cabinet ground connections ....................................................................................91
6.5.
Internal wiring ...................................................................................................................................91
6.5.1.
Optical fibers........................................................................................................................ 94
6.5.1.1.
Optical fibers for internal arc protection .......................................................... 94
6.6.
Cable entries..................................................................................................................................... 95
6.6.1.
Cable entry with sealing modules, type 1...................................................................... 95
6.6.2.
Cable entry with sealing modules, type 2 ......................................................................97
6.6.3.
Cable entry with cable glands...........................................................................................97
6.6.4.
Cable entry with EMC plates ............................................................................................ 98
6.7.
Power cables, ground cables, equipotential bonding conductor....................................... 99
6.7.1.
Preparing the cable entry and the cables ..................................................................... 99
6.7.1.1.
Determining the cable length .............................................................................. 99
6.7.1.2.
Preparing cables for cable entries with cable glands.................................... 99
6.7.1.3.
6.7.2.
Connecting the cables ......................................................................................................102
6.7.2.1.
Checking the cable insulation.............................................................................102
6.7.2.2.
Connecting the cables ..........................................................................................102
6.7.2.3.
Bolted connections................................................................................................105
PRODUCT
ACS5000W gen. 2
DOCUMENT KIND
User manual
DOCUMENT ID.
3BHS799208 E01
CONTENTS
REV.
LANG.
PAGE
J
en
5/186

Advertisement

Table of Contents
loading

Table of Contents