Preparing Cables For Cable Entries With Sealing Modules; Fig. 71. Preparing Control Cables For Sealing Modules - ABB ACS5000 User Manual

Water-cooled (generation 2)
Hide thumbs Also See for ACS5000:
Table of Contents

Advertisement

9. Pull the cable (1) through the entry plate (2).
10. To prevent water from entering the cabinet, fit the
grommet (3) tightly and seal any gaps with silicone.
11. If you removed the entry plate, reinstall the plate, and
fasten it properly.

6.8.1.4. Preparing cables for cable entries with sealing modules

1. Unscrew the frame and remove the sealing modules.
For information on removing and installing the sealing modules and using the compression
wedge, see "Appendix A – Additional manuals".
2. Prepare the cables with an outer cable screen for EMC bonding with the metal enclosure of
the cabinet as illustrated (Fig. 71).

Fig. 71. Preparing control cables for sealing modules

PRODUCT
ACS5000W gen. 2
1
2
3
4
4
4
DOCUMENT KIND
User manual
Key:
(1)
Sealing module
(2)
Conductive foil
(3)
Cable sheath removed to expose cable shield
(4)
Conductor screen extension to be connected
to PE terminal
DOCUMENT ID.
3BHS799208 E01
ELECTRICAL INSTALLATION
3
1
2
REV.
LANG.
PAGE
J
en
107/186

Advertisement

Table of Contents
loading

Table of Contents