7.6. Commissioning checklists

This checklist is designed to help you prepare the drive and associated equipment
for commissioning.

7.6.1. Mechanical installation checklist

6) Drive is aligned according to drive layout drawing (if delivered in several transport
units) and installed according to the instructions in this user manual (3BHS799208
E01).
7) Silicon sealant is applied across roof plate gaps.
8) Roof joints are installed.
9) Pipe joints are orientated and torqued correctly.
10) Roof attachments are installed (if applicable).
11) Busbars are installed and torqued correctly.
12) Raw water piping is completed and pipes are flanged to the drive (if applicable).
13) Raw water supply is ready.
14) Visual inspection:
No badly affixed or damaged components
No foreign objects left in the cabinet
No dirt, dust or moisture in the cabinet

7.6.2. Electrical installation checklist

1) Types and cross sections of control cables suitable for the signal type and signal level.
2) Types and cross sections of power cables selected according to the ABB power cable
specification.
3) Pulse encoder cable shields are connected to the shield earthing point and not
connected directly to the pulse encoder interface (applies only to drives with pulse
encoder interface).
4) Cable entries prepared according to the instructions in the user manual (3BHS799208
E01).
5) Control cable screens and conductors are connected as instructed in the user manual,
labeled appropriately, and the customer side connections are completed.
6) Heating cables (if supplied) connected
7) Wiring across shipping splits is completed according to the instructions in the user
manual (3BHS799208 E01).
8) Ground cable of the drive is securely connected at both ends.
9) Cable armor and screens of power supply cables are connected to PE ground busbar.
10) The transformer and motor cables are installed but the conductors not connected at
both ends (cables and drive must be insulation resistance tested (Megger test)
before connection).
PRODUCT
ACS5000W gen. 2
DOCUMENT KIND
User manual
DOCUMENT ID.
3BHS799208 E01
COMMISSIONING
REV.
LANG.
PAGE
J
en
119/186