7.6.8. Power checklist
1) Medium voltage available for startup of drive.
2) Low voltage is available for startup of drive.
7.6.9. Miscellaneous checklist
1) Sufficient number and correct type of spare parts available
2) Sufficient quantity of deionized water according is available. (see "Appendix C –
Mechanical drawings").
3) Air conditioning of drive room ready for load run of drive
4) Optional equipment (eg, chiller) ready
PRODUCT
ACS5000W gen. 2
DOCUMENT KIND
User manual
DOCUMENT ID.
3BHS799208 E01
COMMISSIONING
REV.
LANG.
PAGE
J
en
121/186