Removal and Installation Routines
Ê Swing the handle (a) in the direction of the arrow (2) until the locking
mechanism of the dummy module disengages.
Ê Remove the dummy module from the slot (2).
Make sure you reinstall a switch blade or dummy module in every empty
!
installation slot as soon as possible to satisfy cooling requirements and
comply with applicable EMC regulations.
Installation
Installation of the switch blade dummy module unit is performed in reverse order.
U41057-J21-Z146-1-76
March 2006
The Switch Blade
02
BX600
105
–
–