Figure 3-27 9.5" Chassis (Rear View)

For External Battery
(12V Connection)
3.4.1

Install Grounding on 9.5" Gateway or Base Chassis

1.
Ensure the 9.5" chassis (CHS2UG GW-US or CHS2UG B-US) is
powered off and the AC power cord is unplugged.
2.
Ground the chassis by connecting a 14 AWG wire from the FG lug on
the back side of the chassis to an electrical service ground (such as a
cold water pipe). Refer to
3.4.2

Install AC Power Cord 9.5" Gateway or Base Chassis

Locate the supplied AC power cord and attach to the AC Inlet located on the
back of the chassis [refer to
3.4.3

Install Additional Blades 9.5" Gateway or Base Chassis

Refer to Chapter 4,
3.4.4

Apply Power to the 9.5" Gateway or Base Chassis

Refer to Chapter 4,
Ground
Figure 3-27 9.5" Chassis (Rear
Figure 3-27 9.5" Chassis (Rear
2.1 Installation and Safety Precautions on page
2.6 Powering Up the SV9100 System on page
CHS2UG B
Chassis
AC Inlet
View).
View)].
4-4.
4-9.
3-23