Figure 7-16 Install Ap300/Ap400 Base Station - NEC Univerge SV9100 System Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

7-16
Install the Base Station
1.
Connect a standard Ethernet cable (Cat 5 or higher) to the Ethernet/
PoE jack on the rear of the base station.
2.
Route the cable through the channel.

Figure 7-16 Install AP300/AP400 Base Station

Power over Ethernet
The DAPs support Power over Ethernet, the so called PoE
(described down in IEEE802.3af specification).
The following overview gives the specifications of the PoE:
Voltage at the AP400: minimum 36 volts, maximum 57 volts.
Connector: Standard RJ45 connector, using the spare wires pins
(wires). Refer to
Layout Ethernet Connector RJ45 on the DAP.
Maximum cable length: 100 meters.
Table 7-6 DAP RJ-45 Pinouts on page 7-17
Installing SV9100 Wireless Telephones
Issue 3.0