Connection Engineering Precautions

4.1.2 Maintenance Space

Reserve sufficient space around the equipment for operation and ventilation.
Figure 4-1 Maintenance space (not combined) (unit: mm)
(1) Wall
(3) Electric control box
Figure 4-2 Maintenance space (combined) (unit: mm)
(1) Wall
(3) Electric control box
Issue 02 (2021-04-15)
Air duct installation: It is recommended that flexible connections be used
between the unit and air duct. Prepare air ducts based on site requirements.
Pipe thermal insulation: Take thermal insulation measures for all inlet pipes
and drainpipes of the FusionCol8000-E. Reserve sufficient space for
maintenance and operations when installing thermal insulation foam for
valves and connectors. At low temperatures, take thermal insulation measures
to prevent water pipes from freezing.
Copyright © Huawei Technologies Co., Ltd.
4 System Installation (FDC Scenario)
(2) Side of the indoor air return vent (end)
(4) Corridor module
(2) Side of the indoor air return vent (end)
(4) Corridor module