FusionCol8000-E240 Modular Indirect Evaporative
Cooling System
User Manual
Figure 3-6 Hoisting the device
Step 5 Secure the device to the concrete platforms using four right angle brackets.
Figure 3-7 Securing the device to the concrete platforms
Step 6 Install the equipotential ground cable or ground lug.
●
Issue 02 (2021-04-15)
Ground lug (engineering procurement): Use hot-dip zinc-coated flat steel
sheet with a cross-sectional area of 40 mm x 4 mm.
Copyright © Huawei Technologies Co., Ltd.
3 System Installation (Building Scenario)
40