Figure 4-30 Installing the electric heater controller
(1) Sheet metal fastener
Step 3 Install a transformer. Install the transformer in the correct position in the PDF and
secure it using screws.
Step 4 Connect the cables. Connect one end of the cables to the transformer terminal of
the electric control box and the other end to the input end of the electric heater
controller.
Figure 4-31 Cable terminal connection
Step 5 Route the heating belt and temperature sensor probe through the condensate
drainage hole, wrap the heating belt around the condensate drainpipe, and ensure
that the temperature sensor probe is closely attached to the drainpipe.
Step 6 Use silicone sealant to seal the gaps between the heating belt, cables, pipe, and
wall panels.
Step 7 Use thermal insulation foam to wrap the heating belt and temperature sensor
probe around the pipe.
Issue 02 (2021-04-15)
NO TE
The cable length is about 11 m, and the cable specification is 3 x 1.5 mm
Copyright © Huawei Technologies Co., Ltd.
4 System Installation (FDC Scenario)
(2) Electric heater controller
(3) Exhaust side panel
2
.
94

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fusioncol8000-e240h4

Table of Contents