Electricity charge apportionment
z
Case1: Electricity meter is not connected
Total electricity charge, billed for multiple indoor units connected to the charge meter for air
conditioning, is apportioned according to the accumulated operation time and indoor unit
operating conditions.
Allows accounting for special rates (e.g., for night or weekend use).
Calculations can be printed as final bills.
Electric power company
Electricity charges
(air conditioning)
System Controller
Tenant A-1
Tenant A-4
Outdoor unit
Tenant B-1
Tenant C-1
Case2: Electricity meter is connected *1
Connecting a electricity meter allows the charges to be calculated for a variety of usage
patterns such as charges for the power used on a per day basis.
*1: UTY-PEGX option is necessary.
System Controller
CT
DPM
Room 301
Room 201
Room 101
Outdoor unit
NOTES:
Multiple
electricity meters can be installed taking into consideration the building design or
other requirements as follows.
▪ Installation of separate electricity meters for the outdoor units and indoor units.
▪ Installation of an electricity meter for the indoor units for each tenant.
▪ Installation of an electricity meter for the outdoor units/indoor units of each floor.
Electricity
meters that can output a pulse for 1 kWh (1 kWh/pulse) for the power consumed by
the air conditioning are recommended.
There may be some restrictions on the
conditions.
The electricity charge apportionment calculation does not comply with the laws and
regulations of the various countries regarding electricity measurements.
Signal transmission line
Tenant A-2
Tenant A-3
Tenant A-5
Tenant A-6
Tenant B-2
Tenant B-3
Tenant C-2
Tenant C-3
Signal transmission line
Room 302
Room 303
Room 202
Room 203
Room 102
Room 103
electricity meter installation depending on the property
- (05 - 16) -

Advertisement

Table of Contents
loading

Table of Contents