Fujitsu AIRSTAGE J-II Design & Technical Manual page 676

Hide thumbs Also See for AIRSTAGE J-II:
Table of Contents

Advertisement

GENERAL SETTING FLOW FOR ENERGY SAVING AND
ELECTRICITY CHARGE APPORTIONMENT USING ELECTRICITY
METER
The general setting flow for realizing an energy saving function and an electricity charge
apportionment function using an electricity meter is shown as an example in the table below.
1 Overview of the energy saving function and electricity
charge apportionment function using an electricity
meter and an understanding of the usage method and
restrictions, etc.
2 Deciding the power source supply system.
Deciding the electricity meter installation sites,
number and the outdoor units which are connected.
Deciding the appropriate VT/CT specifications.
3 Procuring the electricity meters and related hardware
and materials.
4 Electricity meters and related hardware and materials
installation work.
5 Electricity meter setting.
6 Outdoor unit setting.
7 System controller setting.
Note: Outdoor units and indoor units layout, remote controller group combination method, and
other design shall be performed separately.
Flow
Reference item
■Features of Energy Saving Function
■Operation Example
■Notes on Energy Saving Function
■Installation Restriction of Energy Saving Units
■Electricity Charge Apportionment and Electricity Meter
■Electrical Wiring
■Installation Restriction of Electricity Meter
■Electricity Meter System
■Electrical Wiring
■Electrical Wiring
■Setting of Outdoor Unit and System Controller
■Setting of Outdoor Unit and System Controller
Refer also to "6-6-1.OUTDOOR UNIT"
■Setting of Outdoor Unit and System Controller
Refer also to "System Controller Instruction Manual"
- (07-150) -

Advertisement

Table of Contents
loading

Table of Contents