Fujitsu AIRSTAGE J-II Design & Technical Manual page 685

Hide thumbs Also See for AIRSTAGE J-II:
Table of Contents

Advertisement

INSTALLATION RESTRICTION OF ELECTRICITY METER
Functions that requires installation of electricity meter
z
Use an electricity meter having the following functions:
・Electricity charge apportionment function
Install for operation using an electricity meter. (Operation without an electricity meter is also
possible.)
When using an electricity meter, an electricity meter must be installed for all the units which
perform apportionment calculation.
・Peak cut control function
Installation of an electricity meter is essential.
・Power consumption graph display function
Installation of an electricity meter is essential.
[Installation example]
Whm
Whm
Whm
Electricity meter
Whm
Whm
Outdoor unit group
- (07-159) -
Whm
RB group
Remote controller group
Electricity meter
connection range
"Units without electricity meter"
Function which uses an electricity
meter can not be used.