Replacing The Tpm - Fujitsu PRIMERGY RX2540 M7 Upgrade And Maintenance Manual

Table of Contents

Advertisement

Concluding steps
"Installing the crossbar" on page
"Installing the fan cage" on page
"Installing the air duct" on page
▶ Install all riser modules, see
"Reassembling" on page
▶ If applicable, install the OCP module, see
page
262.
▶ Install all PSUs, see
"Connecting the power cord" on page
"Switching on the server" on page
▶ If applicable,
"Installing the front cover with lock" on page
17.4.5

Replacing the TPM

Field Replaceable Unit
(FRU)
RX2540 M7
84.
77.
79.
"Installing a riser module" on page
59.
"Installing a hot-plug PSU" on page
65.
71.
Upgrade and Maintenance Manual
System board and components
"Installing an OCP module" on
126.
71.
Hardware: 35 minutes
74.
501

Advertisement

Table of Contents
loading

Table of Contents