Fujitsu PRIMERGY RX2540 M7 Upgrade And Maintenance Manual page 518

Table of Contents

Advertisement

System board and components
Installing the new system board
▶ Check the settings on the new system board, see
page
555.
▶ Hold the system board on the touch point and insert it at a slight angle. Slide
the connectors into the I/O panel.
▶ Lower the system board carefully into the chassis.
▶ Adjust the system board. If necessary adjust the position of the system
board with a gentle twisting motion (orange circles in
centering bolts).
▶ Fasten the system board with ten screws, see
▶ Fasten the system board with the hexagon standoff, see
▶ Fasten the system board with the two specifical screws, see
▶ Install the memory guide sheet metal.
▶ System with air cooling:
▶ Remove the heat sink with the CPU from the defective system board, see
"Removing the heat sink" on page
▶ Remove the protective plastic cover from the CPU socket of the new
system board and fit it onto the socket of the defective system board
which will be sent back to spares.
Returned system boards
without this cover probably have to be scrapped.
▶ Install the heat sink with the CPU on the new system board, see
"Installing the CPU and heat sink" on page
▶ Connect all cables to the system board.
For the cable plans, see
518
367.
"Appendix B" on page
Upgrade and Maintenance Manual
"Onboard settings" on
Figure 345
Figure
345.
Figure
Figure
372.
559.
show the
344.
345.
RX2540 M7

Advertisement

Table of Contents
loading

Table of Contents