Installation Checklist; Checking The Installation - ABB ACS355 User Manual

Hide thumbs Also See for ACS355:
Table of Contents

Advertisement

Installation checklist

Checking the installation

Check the mechanical and electrical installation of the drive before start-up. Go
through the checklist below together with another person. Read chapter
page
17
of this manual before you work on the drive.
Check
MECHANICAL INSTALLATION
The ambient operating conditions are allowed. (See
installation site
page
364
and
Ambient conditions
The drive is fixed properly on an even vertical non-flammable wall. (See
installation
on page 31.)
The cooling air will flow freely. (See
on page 32.)
The motor and the driven equipment are ready for start. (See
installation:
Checking the compatibility of the motor and drive
Technical
data:
ELECTRICAL INSTALLATION (See
Electrical installation
For ungrounded and corner-grounded systems: The internal EMC filter is disconnected
(EMC screw removed).
The capacitors are reformed if the drive has been stored over a year.
The drive is grounded properly.
The input power voltage matches the drive nominal input voltage.
The input power connections at U1, V1 and W1 are OK and tightened with the correct
torque.
on page
31
as well as
on page 371.)
Mechanical
Motor connection data
Planning the electrical installation
on page 47.)
Mechanical installation: Checking the
Technical
data:
Losses, cooling data and noise
installation:
on page 367.)
Installation checklist 57
Safety
Mechanical
Free space around the drive
Planning the electrical
on page
38
as well as
on page
37
and
on
on

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents