Siemens Sinamics S120 Function Manual page 276

Hide thumbs Also See for Sinamics S120:
Table of Contents

Advertisement

Commissioning
6.7 Commissioning: Basic procedure
● Go to page "SBR"
– "Delay time"
– "Monitoring time"
– "Reference velocity"
● Click "Close" to return to the "Safety Integrated" dialog box.
276
Set the delay time for the monitoring of the braking ramp (p9582) here. After the delay
time, monitoring of the braking ramp will be started.
Set the monitoring time for determination of the braking ramp (p9583) here. The
gradient of the braking ramp depends on p9581 (reference value) and p9583
(monitoring time).
Set the reference value for determination of the braking ramp (p9581) here. The
gradient of the braking ramp depends on p9581 (reference value) and p9583
(monitoring time).
Function Manual, (FHS), 07/2016, 6SL3097-4AR00-0BP6
Safety Integrated

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents