Basic Commissioning With Iop - Siemens Sinamics G120P Operating Instructions Manual

Converter cabinet units 110 kw - 400 kw
Hide thumbs Also See for Sinamics G120P:
Table of Contents

Advertisement

Commissioning
5.3 Commissioning with the IOP
5.3.3

Basic commissioning with IOP

"Basic commissioning" wizard
The "Basic commissioning" wizard described below applies to Control Units as of software
version 4.4.
Procedure
Proceed as follows to perform the basic commissioning of the inverter with the IOP:
0.
1.
2.
3.
136
Select "Basic commissioning..." in the "Wizard" menu.
Select "Yes" or "No" to reset to the factory settings.
The factory settings are reset before all parameter
changes made during the basic commissioning have
been saved.
Select the control type for the connected motor.
Select the motor data for your inverter and the con-
nected motor.
This data is required to calculate the correct speed and
the displayed values for the application.
Inverter cabinet units
Operating Instructions, 12/2014, A5E32923362A

Advertisement

Table of Contents
loading

Table of Contents