Siemens Sinamics G120P Operating Instructions Manual page 148

Converter cabinet units 110 kw - 400 kw
Hide thumbs Also See for Sinamics G120P:
Table of Contents

Advertisement

Commissioning
5.5 Procedure for commissioning via STARTER
Figure 5-6
⇒ Enter a project name and, if necessary, the author, memory location and a comment.
⇒ Click Continue > to set up the PG/PC interface.
Figure 5-7
⇒ Click on Access point ..., to set the access point to the drive device.
148
Create new project
Set up interface
Inverter cabinet units
Operating Instructions, 12/2014, A5E32923362A