Siemens Sinamics G120P Operating Instructions Manual page 299

Converter cabinet units 110 kw - 400 kw
Hide thumbs Also See for Sinamics G120P:
Table of Contents

Advertisement

Figure 6-30
Basic commissioning
The basic commissioning of the inverter and motor includes the following steps:
● Selection of the closed-loop control type
● Selection of the motor type and input of the motor data
● Input of the data for the ramp-function generator
● Selection of the sensor for the motor temperature
● Calculation of the motor and closed-loop control data
The wizard navigates you through the basic commissioning and displays various associated
screens in which the options and values required for the commissioning can be set. The data
in the inverter can be saved after completion of the basic commissioning. See Basic
commissioning with IOP (Page 136).
Inverter cabinet units
Operating Instructions, 12/2014, A5E32923362A
Example of a motor type plate
Operation
6.10 Operation with the IOP
299

Advertisement

Table of Contents
loading

Table of Contents