Installation; Lifting The Cabinet Off The Transport Pallet - Siemens Sinamics G120P Operating Instructions Manual

Converter cabinet units 110 kw - 400 kw
Hide thumbs Also See for Sinamics G120P:
Table of Contents

Advertisement

Mechanical installation
3.3 Assembly
3.3.3

Installation

3.3.3.1

Lifting the cabinet off the transport pallet

Lifting the cabinet off the transport pallet
The applicable local guidelines regarding the transportation of the cabinet from the transport
palette to the installation location must be observed.
A crane transport assembly is fitted to the top of the cabinet.
The fixing screws of the transport pallets can be removed without having to lift the cabinet
unit. The positions of the fixing screws are indicated by red markings on the outside of the
pallets.
Figure 3-6
42
Transport pallet, markings for the positions of the mounting bolts, example for cabinet
unit with base section
Inverter cabinet units
Operating Instructions, 12/2014, A5E32923362A

Advertisement

Table of Contents
loading

Table of Contents