Document Revision History - ABB Relion 670 Series Applications Manual

Bay control
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 511 401-UUS F
The operation manual contains instructions on how to operate the IED once it has been
commissioned. The manual provides instructions for the monitoring, controlling and setting of the
IED. The manual also describes how to identify disturbances and how to view calculated and
measured power grid data to determine the cause of a fault.
The application manual contains application descriptions and setting guidelines sorted per
function. The manual can be used to find out when and for what purpose a typical protection
function can be used. The manual can also provide assistance for calculating settings.
The technical manual contains operation principle descriptions, and lists function blocks, logic
diagrams, input and output signals, setting parameters and technical data, sorted per function.
The manual can be used as a technical reference during the engineering phase, installation and
commissioning phase, and during normal service.
The communication protocol manual describes the communication protocols supported by the
IED. The manual concentrates on the vendor-specific implementations.
The point list manual describes the outlook and properties of the data points specific to the IED.
The manual should be used in conjunction with the corresponding communication protocol
manual.
The cyber security deployment guideline describes the process for handling cyber security when
communicating with the IED. Certification, Authorization with role based access control, and
product engineering for cyber security related events are described and sorted by function. The
guideline can be used as a technical reference during the engineering phase, installation and
commissioning phase, and during normal service.
1.3.2

Document revision history

Document
revision
-
A
B
C
D
E
F
Bay control REC670
Application manual
Date
Product revision
2017-05
2.2.0
2017-10
2.2.1
2018-03
2.2.1
2018–06
2.2.2
2018–11
2.2.3
2019-05
2.2.3
© Copyright 2017 ABB. All rights reserved
History
First release for product version 2.2
Ethernet ports with RJ45 connector added. enhancements/
updates made to ZMFPDIS and ZMFCPDIS.
Document enhancements and corrections
LDCM galvanic X.21 added. Function PTRSTHR added.
Ordering section updated.
Functions CHMMHAI, VHMMHAI, DELVSPVC, DELSPVC and
DELISPVC added. Updates/enhancements made to HZPDIF,
CCRBRF, REALCOMP, PTRSTHR and FNKEYMDx. Ordering
section updated.
Document not released
PTP enhancements and corrections
Section 1
Introduction
GUID-34B323E4-1319-4D42-80CE-29B0F2D36E2C v2
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rec670

Table of Contents