ABB Relion 670 Series Applications Manual page 535

Bay control
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 511 401-UUS F
Function description
Four step phase
overcurrent protection
Overexcitation protection
Out-of-step protection
Busbar differential
protection, check zone
Busbar differential
protection, dynamic zone
selection
Busbar differential
protection, single phase
feeder xx
Voltage delta supervision,
2 phase
DELSPVC
20.3.4.2
Setting examples for IEC/UCA 61850-9-2LE and time synchronization
The IED and the Merging Units (MU) should use the same time reference especially if analog data
is used from several sources, for example from an internal TRM and an MU, or if several physical
MUs are used. Having the same time reference is important to correlate data so that channels
from different sources refer to the correct phase angle.
When only one MU is used as an analog source, it is theoretically possible to do without time
synchronization. However, this would mean that timestamps for analog and binary data/events
become uncorrelated. If the IED has no time synchronization source configured, then the binary
data/events will be synchronized with the merging unit. However, the global/complete time might
not be correct. Disturbance recordings then appear incorrect since analog data is timestamped by
MU, and binary events use the internal IED time. It is thus recommended to use time
synchronization also when analog data emanate from only one MU.
An external time source can be used to synchronize both the IED and the MU. It is also possible to
use the MU as a clock master to synchronize the IED from the MU. When using an external clock, it
is possible to set the IED to be synchronized via PPS,IRIG-B or PTP. It is also possible to use an
internal GPS receiver in the IED (if the external clock is using GPS).
Bay control REC670
Application manual
IEC 61850 identification
OC4PTOC
OEXPVPH
OOSPPAM
BCZPDIF
BDZSGAPC
BFPTRC_Fx, (1≤x≤24)
DELVSPVC
Current harmonic
monitoring, 2 phase
© Copyright 2017 ABB. All rights reserved
Function description
Power swing detection
Mho Impedance
supervision logic
Transformer tank
overcurrent protection
Busbar differential
protection, bus
interconnection xx
Busbar differential
protection, zone 1
Through fault monitoring
Current delta supervision,
2 phase
CHMMHAN
Section 20
Station communication
IEC 61850 identification
ZMRPSB
ZSMGAPC
TPPIOC
BICPTRC_x, (1≤x≤5)
BZNPDIF_Zx, (1≤x≤6)
PTRSTHR
DELISPVC
GUID-CEDD520A-8A13-41DF-BFF1-8A3B4C00E098 v3
529

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rec670

Table of Contents