Section 20
Station communication
IEC08000069 V2 EN-US
Figure 236: Example of a station configuration with the IED receiving analog values from
20.3.2
Faulty merging unit for bay in service
When a merging unit goes faulty while the bay is in service, the protection functions connected to
that merging unit get blocked. Also, protection functions configured in a 1 1/2 circuit breaker
applications, where two SV streams from different merging units are combined get blocked. Thus,
this has no effect on protection functions in a 1 1/2 circuit breaker configuration.
This can be resolved by connecting external binary input signals to the BLOCK input on the
respective SMAI function blocks with the use of ACT. When the BLOCK input on a SMAI function is
524
Station Wide
SCADA System
Other
Relays
CT
both classical measuring transformers and merging units.
© Copyright 2017 ABB. All rights reserved
IEC61850-8-1
IEC61850-8-1
110 V
IED
1 A
1 A
IEC61850-9-2LE
Ethernet Switch
IEC61850-9-2LE
ABB
Merging
Unit
Combi
CT
Sensor
Conventional VT
1MRK 511 401-UUS F
Station Wide
GPS Clock
Splitter
Electrical-to-
Optical Converter
1PPS
1PPS
en08000069-3.vsd
GUID-CBAB6232-91E6-487C-8C75-7150E2350A6B v1