ABB Relion 670 Series Applications Manual page 8

Bay control
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

Table of contents
4.2.2.5
4.2.2.6
4.2.2.7
4.2.3
Relationships between setting parameter Base Current, CT rated primary current
and minimum pickup of a protection IED.................................................................................. 71
4.2.4
Setting of voltage channels.......................................................................................................... 72
4.2.4.1
4.2.4.2
4.2.4.3
4.2.4.4
4.2.4.5
4.2.4.6
4.2.4.7
Section 5
Local HMI............................................................................................................ 85
5.1
Display.................................................................................................................................................86
5.2
LEDs..................................................................................................................................................... 87
5.3
Keypad................................................................................................................................................ 88
5.4
Local HMI functionality....................................................................................................................90
5.4.1
Protection and alarm indication..................................................................................................90
5.4.2
Parameter management ...............................................................................................................91
5.4.3
Front communication.................................................................................................................... 92
Section 6
Wide area measurement system..................................................................... 93
6.1
C37.118 Phasor Measurement Data Streaming Protocol Configuration PMUCONF........... 93
6.1.1
Identification................................................................................................................................... 93
6.1.2
Application....................................................................................................................................... 93
6.1.3
Operation principle........................................................................................................................ 93
6.1.3.1
6.1.3.2
6.2
Protocol reporting via IEEE 1344 and C37.118 PMUREPORT.................................................... 96
6.2.1
Identification................................................................................................................................... 96
6.2.2
Application....................................................................................................................................... 97
6.2.3
Operation principle........................................................................................................................ 99
6.2.3.1
6.2.3.2
6.2.3.3
6.2.3.4
6.2.4
Setting guidelines.........................................................................................................................109
2
Example on how to connect a wye connected three-phase CT set to the IED............. 64
Example how to connect delta connected three-phase CT set to the IED....................68
Example how to connect single-phase CT to the IED........................................................ 70
Example....................................................................................................................................... 72
Examples how to connect, configure and set VT inputs for most commonly
used VT connections.................................................................................................................72
Examples on how to connect a three phase-to-ground connected VT to the IED....... 73
Example on how to connect a phase-to-phase connected VT to the IED...................... 75
Example on how to connect an open delta VT to the IED for high impedance
grounded or ungrounded networks...................................................................................... 77
Example how to connect the open delta VT to the IED for low impedance
grounded or solidly grounded power systems................................................................... 79
Example on how to connect a neutral point VT to the IED............................................... 82
Short guidance for use of TCP................................................................................................94
Short guidance for use of UDP............................................................................................... 95
Frequency reporting...............................................................................................................100
Reporting filters.......................................................................................................................101
Scaling Factors for ANALOGREPORT channels................................................................. 102
PMU Report Function Blocks Connection Rules in PCM600 Application
Configuration Tool (ACT)...................................................................................................... 104
© Copyright 2017 ABB. All rights reserved
Bay control REC670
Application manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rec670

Table of Contents