Signals - Hitachi Relion 650 Series Technical Manual

Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

1MRK 511 557-UEN Rev. A
9.3.4

Signals

Table 32:
Name
BLOCK
BLOCKALL
U3P
I3P
VOLREFOK
CURREFOK
CONT
BLKOPOPR
BLKCLOPR
CNOPCMD
CNCLCMD
CMDOPEN
CMDCLOSE
CBTSMODE
CRDBLSSX
OPRCNTINL1
OPRCNTINL2
OPRCNTINL3
CBSTSCFL1
CBSTSCFL2
CBSTSCFL3
INPRIOPL1
INPRIOPL2
INPRIOPL3
INPRICLL1
INPRICLL2
INPRICLL3
PPREARCL1
PPREARCL2
PPREARCL3
COMPOFCL1
COMPOFCL2
Table continues on next page
Technical Manual
SSCPOW Input signals
Type
Default
BOOLEAN
BOOLEAN
GROUP
SIGNAL
GROUP
SIGNAL
BOOLEAN
BOOLEAN
BOOLEAN
BOOLEAN
BOOLEAN
BOOLEAN
BOOLEAN
BOOLEAN
BOOLEAN
BOOLEAN
INTEGER
INTEGER
INTEGER
INTEGER
INTEGER
INTEGER
INTEGER
REAL
REAL
REAL
REAL
REAL
REAL
REAL
REAL
REAL
REAL
REAL
© 2021 Hitachi Energy. All rights reserved.
Description
0
Block all binary outputs
0
Block all switching operations and triggering of operation log
-
Three-phase reference voltage
-
Three-phase reference current
0
Voltage signal is suitable as reference
0
Current signal is suitable as reference
0
Apply contingency mode (block/bypass) to switching commands
0
Block CB opening operations
0
Block CB closing operations
0
Cancel signal from PIO board for unsuccessful opening command
operation
0
Cancel signal from PIO board for unsuccessful closing command
operation
0
Incoming controlled opening command
0
Incoming controlled closing command
0
Circuit breaker timing test mode activated
0
Coordination input from CBLEARN to SSCPOW
0
Operation count of phase L1
0
Operation count of phase L2
0
Operation count of phase L3
0
Circuit breaker position input from ACBMSCBR for phase L1
0
Circuit breaker position input from ACBMSCBR for phase L2
0
Circuit breaker position input from ACBMSCBR for phase L3
0.0
Nominal time from Open command to main contact separation in
phase L1
0.0
Nominal time from Open command to main contact separation in
phase L2
0.0
Nominal time from Open command to main contact separation in
phase L3
0.0
Nominal time from Close command to main contact touch in
phase L1
0.0
Nominal time from Close command to main contact touch in
phase L2
0.0
Nominal time from Close command to main contact touch in
phase L3
0.0
Predicted pre-arcing time for closing of phase L1
0.0
Predicted pre-arcing time for closing of phase L2
0.0
Predicted pre-arcing time for closing of phase L3
0.0
Mechanical compensation offset for closing instant in phase L1
0.0
Mechanical compensation offset for closing instant in phase L2
Section 9
Control
PID-7616-INPUTSIGNALS v2
73