NEC Express5800 140Rd-4 User Manual page 70

Windows server 2003 x64 editions
Hide thumbs Also See for Express5800 140Rd-4:
Table of Contents

Advertisement

3-10
Insert the rails on the side faces of the server into the slide rail assemblies securely and then push the server slowly
and carefully. If the server is locked on the way, push the server slowly with the depression of the release lever on
each of the left and right sides.
IMPORTANT:
lever with your fingers may cause the fingers to be caught and thus injured.
NOTE:
The slide rail assembly installed in the rack contains a slide rail called the bearing rail.
The bearing rail can be moved freely in the slide rail assembly. To install the server in the rack
securely, slide the bearing rail to the front of the rack to put the plastic components at the tip of the
rail and the inner rail into the server.
At the first installation, you may feel strong friction in pushing because the mechanical components cannot be
completely engaged with each other. Push the server intensely.
NOTE:
While the server is pushed into the rack, the server may be locked and thus cannot be
pus
hed any more. This is because the lock lever on the rail prohibits the server from being
into th
e rack any more. Set the lock lever to be on the level
server
into the rack slowly.
Bearing rail
Slide rail assembly
Push each release lever using a screwdriver or a similar tool. Pushing a release
Plastic portions
Inner rail
Mating portion
to release the lock and then push the
Release lever
pushed

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents