Initial Commissioning Of Additional Devices - Siemens SINUMERIK 828D Operating Manual

Computerized numerical controller for machine tools
Hide thumbs Also See for SINUMERIK 828D:
Table of Contents

Advertisement

Easy Extend (828D only)

22.4 Initial commissioning of additional devices

22.4
Initial commissioning of additional devices
Normally, the device has already been commissioned by the machine manufacturer. If an
initial commissioning has not been performed or if, for example, function tests are to be
performed again (e.g. when retrofitting additional devices), this is possible at any time.
The "Start-up" softkey has been declared as Manufacturer data class (M).
Procedure
880
1.
Select the "Parameter" operating area.
2.
Press the menu forward key and then the "Easy Extend" softkey.
3.
Press the "Start-up" softkey.
A new vertical softkey bar appears.
4.
Press the "Comm. start-up" softkey to start the commissioning.
Before starting, a complete data backup is generated which you can
then use in case of an emergency.
5.
Press the "Cancel" softkey if you want to abort the commissioning
prematurely.
6.
Press the "Restore" softkey to load the original data.
7.
Press the "Device function test" softkey to test the machine manufac-
turer's intended function.
Operating Manual, 01/2015, 6FC5398-8CP40-5BA2
Turning

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinumerik 840d sl

Table of Contents