Computer Link Connection (Connection To Serial Communication Module Mounted On Remote I/O Station); Computer Link Connection - Mitsubishi Electric GT1685 Connection Manual

Got1000 series
Table of Contents

Advertisement

4.1.2
Computer link connection (Connection to serial communication module
mounted on remote I/O station)
This section explains the computer link connection that connects the GOT to the serial communication module mounted
on the remote I/O station of the MELSECNET/H network system.
The following shows an example of connecting the GOT to the serial communication module mounted on the remote I/O
station of the MELSECNET/H network system.
Monitor target
Control system
(System A)
Network No. 1, Station No. 2
(Remote I/O station)
(1) Connection method
Connect the GOT to the serial communication module (QJ71C24, QJ71C24-R2, QJ71C24N, QJ71C24N-R2,
QJ71C24N-R4) or modem interface module (QJ71CM0) mounted on the remote I/ O station of the
MELSECNET/H network system.
For details, refer to the following.

7. COMPUTER LINK CONNECTION

(2) GT Designer3 setting
Set GT Designer3 as follows.
Setting item
Controller Type
Device setting (Network setting)
Q Redundant Setting
*1
GT14 and GT11 are not compatible with MELSEC-QS.
*2
Only the CPU which is connected to GT11 in the computer link connection can be monitored on GT11. The setting of GT
Designer3 is not necessary.
In this case, the GOT monitoring is performed by transient transmission of the MELSECNET/H network system.
Therefore, a longer time-lag occurs for displaying objects compared with directly monitoring the PLC CPU.
For displaying objects with a shorter time-lag or using GT11, set the device for link devices B and W of the host
station set in the MELSECNET/H network and execute the cyclic transmission.
For details, refer to the following manual.
Q Corresponding MELSECNET/H Network System Reference Manual (Remote I/Q network)
(3) Monitoring target change when system switching occurs in a redundant system
When the system switching occurs, the multiplexed remote sub master station switched to the control system
takes over the master operation of MELSECNET/H.
Since the GOT monitors the master station, the monitoring target is automatically changed to the PLC CPU that
is operating as the master.
Network No. 1, Station No. 0
(Multiplexed remote master station)
MELSECNET/H remote I/O network
GT16, GT15, GT12: MELSEC-QnA/Q/QS, MELDAS C6*
GT14, GT11: MELSEC-QnA/Q, MELDAS C6*
NW No.: Network No. of MELSECNET/H remote I/O network
Other
Station No.: 0 (Master station)
Do not set the item.
4. HOW TO MONITOR REDUNTANT SYSTEM
4.1 Connection to Remote I/O Station in MELSECNET/H Network System
Network No. 1, Station No. 1
(Multiplexed remote sub master station)
Computer link connection
GOT
Settings
*1
1
2
Standby system
(System B)
3
4
5
Model
6
*2
7
8
4 - 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents