Check On The Plc - Mitsubishi Electric GT1685 Connection Manual

Got1000 series
Table of Contents

Advertisement

1.6.6

Check on the PLC

Checking the wiring state of the optical fiber cable (For CC-Link IE Controller Network only)
Check if the fiber-optic cable is connected correctly to all the modules in the CC-Link IE Controller Network.
Perform the line test from the control station of the CC-Link IE Controller Network to check the wiring state of the
fiber-optic cable.
For the line testing method, refer to the following manual.
Checking the wiring state of the CC-Link dedicated cable (For CC-Link system only)
Check if the CC-Link dedicated cable is connected correctly to all the modules in the CC-Link system.
Perform the line test from the master station of the CC-Link System to check the wiring state of the CC-Link
dedicated cable.
For the line testing method, refer to the following manuals.
1 - 56
1. PREPARATORY PROCEDURES FOR MONITORING
1.6 Checking for Normal Monitoring
CC-Link IE Controller Network Reference Manual
CC-Link System Master/Local Module User's Manual QJ61BT11N
CC-Link System Master/Local Module User's Manual AJ61QBT11, A1SJ61QBT11
CC-Link System Master/Local Module User's Manual AJ61BT11, A1SJ61BT11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents