Operation - ABB REC 561 User Manual

Bay level control terminal
Table of Contents

Advertisement

ABB Network Partner AB
Version 1.0-00
SYN1

OPERATION

RELEASE
SYN1-BLOCK
UDiff
UBusHigh
ULineHigh
FreqDiff
PhaseDiff
AUTOENERG1
MANENERG1
From energizing
check (fig.9)
Synchronism and energizing
check for double circuit breakers
and voltage selection
Output signals
SYNX-AUTOOK
SYNX-MANOK
OFF
ON
50ms
t
&
Fig. 6
Description
Synchro-check/energizing OK. The output sig-
nal is high when the synchro-check conditions
set on the MMI are fulfilled. It can also include
the energizing condition, if selected. The signal
can be used to release the auto-recloser before
closing attempt of the circuit breaker. It can also
be used as a free signal.
Same as above but with alternative settings of
the direction for energizing to be used during
manual closing of the circuit breaker.
&
&
&
Block diagram - Synchro-check
1MRK 580 167-XEN
Page
5 - 37
1
SYN1-AUTOOK
1
SYN1-MANOK
(X80167-6)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents