Version 1.0-00
4.3.3 Energizing in both
directions (DLLB or
DBLL)
Synchronism and energizing
check for double circuit breakers
and voltage selection
1
Change the MMI settings AutoEnerg and ManEnerg to Both.
2
Apply a single-phase voltage of 30% U
a single-phase voltage of 100% U
3
Check that the "SYN1-AUTOOK" and "SYN1-MANOK" outputs
are activated.
4
Change the connection so that the U-line (UL1) is equal to100% U
sqr3 and the U-bus (U5) is equal to 30% U
5
The outputs should still be activated.
6
The test can be repeated with different values on the U-bus and the U-
line.
7
Restore the equipment to normal or desired settings.
1MRK 580 167-XEN
/sqr3 to the U-line (UL1) and
r
/sqr3 to the U-bus (U5).
r
/sqr3.
r
Page
5 - 45
/
r

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents